Skip to content
RDK BathsBathroom Remodeling
Home/Services/Full Bathroom Remodels

RDK Baths · Mobile, Baldwin & Pensacola

Full Bathroom Remodels

The whole room, gutted to the studs and built back new.

The biggest of the three, and the one that changes the room most. We strip the bathroom back to the studs and rebuild it as one finished room — new layout where it helps, new plumbing and electrical rough-in, new tile, vanity, lighting and paint. You pick the tile, the vanity, the fixtures and the finish; we handle ordering, delivery, scheduling and installation. Most full bathrooms take two to three weeks on site.

Full Bathroom Remodels

What’s included

Everything below is handled by our crew — you are not hiring or coordinating a separate plumber, tiler or electrician.

Every trade, every job: demolition, plumbing, electrical, carpentry, masonry, drywall, tile installation and painting — all included, all by us.

See the full list
  • New shower or tub and surround
  • Custom or stock vanity and countertop
  • Floor and wall tile
  • New faucets, shower valve and fixtures
  • Lighting, mirrors and exhaust fan
  • Drywall, paint and trim
  • Plumbing and electrical rough-in
Everything included

Every trade on the job,
under one roof.

A bathroom touches more trades than almost any room in a house. RDK Baths covers all of them — so you are not hiring a plumber, then an electrician, then waiting on a drywall crew that never shows.

All of it is included in the price.

We handle the job from start to finish — the first day of demolition through the final walkthrough and cleanup.

Free estimatesFully insuredGet yours
  • 01

    Demolition

    Careful tear-out, the rest of the house protected, and all of the debris hauled away.

  • 02

    Plumbing

    Supply lines, drains, valves and the new fixtures — set, tested and leak-free before anything is closed up.

  • 03

    Electrical

    Circuits, GFCI protection, lighting, exhaust fans and vanity sconces, done to code.

  • 04

    Carpentry

    Framing, blocking behind grab bars, subfloor repair, door and trim work.

  • 05

    Drywall & Sheetrock

    Hang, tape, mud and sand — plus waterproof backer board in every wet area.

  • 06

    Masonry

    Mortar work, thresholds and any block or brick the room needs at a sill or window.

  • 07

    Tile Installation

    Wall and floor tile set level and true — shower walls, niches, penny rounds and large-format floors, grouted and sealed.

  • 08

    Painting

    Walls, ceilings and trim, prepped properly and finished last so nothing gets scuffed.

One job, one crew, start to finish

  1. Tear-out
  2. Rough-in
  3. Waterproofing
  4. Tile
  5. Install
  6. Paint
  7. Walkthrough

Want a price on full bathroom remodels?

Free estimate, fully insured, and we handle the job from start to finish.

CallTextEstimate