Skip to content
RDK BathsBathroom Remodeling
Home/Services/Walk-In Tubs & Accessibility

RDK Baths · Mobile, Baldwin & Pensacola

Walk-In Tubs & Accessibility

A bathroom that stays safe and independent at home.

For homeowners caring for a parent or planning ahead for themselves. We install walk-in tubs with a watertight door and built-in seat, curbless and low-threshold showers, fold-down seats, and grab bars anchored into blocking we put in the wall ourselves so they hold when someone leans on them. We can also widen a doorway if it needs it.

Walk-In Tubs & Accessibility

What’s included

Everything below is handled by our crew — you are not hiring or coordinating a separate plumber, tiler or electrician.

Every trade, every job: demolition, plumbing, electrical, carpentry, masonry, drywall, tile installation and painting — all included, all by us.

See the full list
  • Walk-in tubs with a low entry and built-in seat
  • Curbless and low-threshold showers
  • Fold-down shower seats
  • Grab bars anchored into real blocking
  • Slip-resistant flooring
  • Wider doorways where needed
Everything included

Every trade on the job,
under one roof.

A bathroom touches more trades than almost any room in a house. RDK Baths covers all of them — so you are not hiring a plumber, then an electrician, then waiting on a drywall crew that never shows.

All of it is included in the price.

We handle the job from start to finish — the first day of demolition through the final walkthrough and cleanup.

Free estimatesFully insuredGet yours
  • 01

    Demolition

    Careful tear-out, the rest of the house protected, and all of the debris hauled away.

  • 02

    Plumbing

    Supply lines, drains, valves and the new fixtures — set, tested and leak-free before anything is closed up.

  • 03

    Electrical

    Circuits, GFCI protection, lighting, exhaust fans and vanity sconces, done to code.

  • 04

    Carpentry

    Framing, blocking behind grab bars, subfloor repair, door and trim work.

  • 05

    Drywall & Sheetrock

    Hang, tape, mud and sand — plus waterproof backer board in every wet area.

  • 06

    Masonry

    Mortar work, thresholds and any block or brick the room needs at a sill or window.

  • 07

    Tile Installation

    Wall and floor tile set level and true — shower walls, niches, penny rounds and large-format floors, grouted and sealed.

  • 08

    Painting

    Walls, ceilings and trim, prepped properly and finished last so nothing gets scuffed.

One job, one crew, start to finish

  1. Tear-out
  2. Rough-in
  3. Waterproofing
  4. Tile
  5. Install
  6. Paint
  7. Walkthrough

Want a price on walk-in tubs & accessibility?

Free estimate, fully insured, and we handle the job from start to finish.

CallTextEstimate