RDK Baths · Mobile, Baldwin & Pensacola
Quarter Bathroom Remodels
A powder room or small half bath, redone top to bottom.
The smallest project we take on, and a good way to fix a bathroom that is dated, cramped or just worn out. A quarter bath is the single-fixture room — the little bath off a hallway, under the stairs, or beside the laundry. New floor, fresh paint, a new vanity and sink, a new toilet, and new lighting and hardware. Because there is no tub or shower involved, most of these are finished in a few days with very little disruption to the rest of the house.

What’s included
Everything below is handled by our crew — you are not hiring or coordinating a separate plumber, tiler or electrician.
Every trade, every job: demolition, plumbing, electrical, carpentry, masonry, drywall, tile installation and painting — all included, all by us.
See the full list- New vanity, sink and faucet
- New toilet
- Floor tile or luxury vinyl
- Fresh paint and trim
- New mirror, lighting and hardware
Every trade on the job,
under one roof.
A bathroom touches more trades than almost any room in a house. RDK Baths covers all of them — so you are not hiring a plumber, then an electrician, then waiting on a drywall crew that never shows.
All of it is included in the price.
We handle the job from start to finish — the first day of demolition through the final walkthrough and cleanup.
- 01
Demolition
Careful tear-out, the rest of the house protected, and all of the debris hauled away.
- 02
Plumbing
Supply lines, drains, valves and the new fixtures — set, tested and leak-free before anything is closed up.
- 03
Electrical
Circuits, GFCI protection, lighting, exhaust fans and vanity sconces, done to code.
- 04
Carpentry
Framing, blocking behind grab bars, subfloor repair, door and trim work.
- 05
Drywall & Sheetrock
Hang, tape, mud and sand — plus waterproof backer board in every wet area.
- 06
Masonry
Mortar work, thresholds and any block or brick the room needs at a sill or window.
- 07
Tile Installation
Wall and floor tile set level and true — shower walls, niches, penny rounds and large-format floors, grouted and sealed.
- 08
Painting
Walls, ceilings and trim, prepped properly and finished last so nothing gets scuffed.
One job, one crew, start to finish
- Tear-out
- Rough-in
- Waterproofing
- Tile
- Install
- Paint
- Walkthrough
Want a price on quarter bathroom remodels?
Free estimate, fully insured, and we handle the job from start to finish.