Skip to content
RDK BathsBathroom Remodeling
Home/Services/Half Bathroom Remodels

RDK Baths · Mobile, Baldwin & Pensacola

Half Bathroom Remodels

A guest bath or hall bath with a shower, without the full tear-out.

A half bath is the bathroom a household actually uses every day — a tub or shower, a toilet, and a vanity in a room that is usually a good bit smaller than the primary. It is a real remodel, but not a whole-house project: new tile in the wet area, a new vanity and top, new fixtures, lighting and paint, and the plumbing and electrical brought up to what the room needs. We can keep the existing footprint or rearrange it if the plumbing allows. Most half baths take about a week to ten days.

Half Bathroom Remodels

What’s included

Everything below is handled by our crew — you are not hiring or coordinating a separate plumber, tiler or electrician.

Every trade, every job: demolition, plumbing, electrical, carpentry, masonry, drywall, tile installation and painting — all included, all by us.

See the full list
  • Tiled shower or tub surround
  • New vanity, countertop and sink
  • New toilet and shower valve
  • Floor tile
  • Lighting, mirror and exhaust fan
  • Drywall, paint and trim
Everything included

Every trade on the job,
under one roof.

A bathroom touches more trades than almost any room in a house. RDK Baths covers all of them — so you are not hiring a plumber, then an electrician, then waiting on a drywall crew that never shows.

All of it is included in the price.

We handle the job from start to finish — the first day of demolition through the final walkthrough and cleanup.

Free estimatesFully insuredGet yours
  • 01

    Demolition

    Careful tear-out, the rest of the house protected, and all of the debris hauled away.

  • 02

    Plumbing

    Supply lines, drains, valves and the new fixtures — set, tested and leak-free before anything is closed up.

  • 03

    Electrical

    Circuits, GFCI protection, lighting, exhaust fans and vanity sconces, done to code.

  • 04

    Carpentry

    Framing, blocking behind grab bars, subfloor repair, door and trim work.

  • 05

    Drywall & Sheetrock

    Hang, tape, mud and sand — plus waterproof backer board in every wet area.

  • 06

    Masonry

    Mortar work, thresholds and any block or brick the room needs at a sill or window.

  • 07

    Tile Installation

    Wall and floor tile set level and true — shower walls, niches, penny rounds and large-format floors, grouted and sealed.

  • 08

    Painting

    Walls, ceilings and trim, prepped properly and finished last so nothing gets scuffed.

One job, one crew, start to finish

  1. Tear-out
  2. Rough-in
  3. Waterproofing
  4. Tile
  5. Install
  6. Paint
  7. Walkthrough

Want a price on half bathroom remodels?

Free estimate, fully insured, and we handle the job from start to finish.

CallTextEstimate